Catchment Area for a Culvert or Stream Crossing

Every farm culvert table starts with the same number: how much land drains to the crossing. Here is how to get it in hectares from LiDAR, instead of counting squares on a topo map.

A culvert that is too small for the land above it backs up in a big storm. Water goes over the top, scours the fill out and takes the crossing with it, or it finds a new way round. Sizing one properly starts with the catchment area above the crossing, then the rainfall where you are.

The farm guides put it in that order. DairyNZ’s crossings technote and the Ministry for the Environment’s culvert and bridge guide for farmers both begin with “determine the catchment area above the crossing point”, and suggest counting squares on an NZMS 1:50,000 map, where one square is 100 ha. Then you find your rainfall band and read a pipe size off their tables.

Why a topo map struggles with farm crossings

Most farm crossings drain a few hectares to a few dozen: a fraction of one map square. At that size the 20 m contours on a topo map often cannot show where the ridgeline between two gullies sits, so the answer depends on how you draw it. LINZ’s LiDAR ground model reads the ground about every metre. Route water over it and the catchment above any point comes out to a tenth of a hectare.

Measure the catchment above your crossing

Click the stream just above the crossing and run Catchment. The area appears in hectares, with the land shaded on the map. Free to use, no login.

Open Catchment →

Five steps

01

Open Catchment and find the crossing

Search the address or pan to it, and zoom in until you can see the stream, drain or gully where it meets the track or race.

Catchment →
02

Click on the upstream side of the crossing

The water paths appear around your click and the point snaps onto the nearest one. Check the dark dot sits on the stream you mean, just above the crossing, not on the track or on a side swale.

Catchment →
03

Draw any culverts upstream

If water reaches your crossing through a pipe under a road or race higher up, draw that culvert under Culverts & barriers. Pipes are not in the ground model, so without it that water may be sent somewhere else.

Culverts & barriers →
04

Run it and read the hectares

The contributing area appears in hectares, with the land shaded on the map. Look at the shape: does it follow the ridgelines you know? A "Not the whole catchment" warning means the area is a minimum.

Catchment →
05

Take the number to the culvert tables

In DairyNZ’s crossings technote or MfE’s culvert guide, find your rainfall band on the map, then the catchment area nearest yours. The table gives a pipe size. If your catchment is bigger than the table goes, ask your regional council or an engineer.

Catchment →

What the tables assume

A few things DairyNZ’s technote says about its own tables are worth knowing before you use the number:

  • They are built for small storms. In most cases the sizes pass about a one-in-five-year storm, so the crossing needs a way for bigger floods to go over or around without washing it out.
  • There is a minimum. The technote recommends no culvert smaller than 300 mm anywhere, because smaller pipes block.
  • Existing culverts are not a guide. Many in place are the wrong size, so copying the one downstream can copy its mistake.
  • Big catchments are outside them. Above the largest area in the tables, the MfE guide says to ask your regional council or a rivers engineer.

An example: a new race crossing

Illustrative, not a real farm. A farmer is putting a culvert under a new race where it crosses a gully. Counting squares, the gully looks like a quarter of a square, so about 25 ha. Catchment, clicked just above the race, shows 11.4 ha: the ridgeline on the west side sits further in than the topo contours suggested, and a swale that looked like part of the gully actually drains to the next one. With an 11.4 ha figure and the farm’s rainfall band, the table gives the pipe size. The farmer also draws the existing culvert under the neighbour’s road above, reruns, and the area stays the same: that pipe already drains into this gully.

Keep the outline

The area and the map are free. With a pass, the catchment outline downloads as DXF in NZTM2000 for CAD, or GeoJSON and KML for a GIS or Google Earth, so a contractor or engineer sees the same land you measured.

What this cannot tell you

  • The pipe size. That needs the rainfall band and the tables, or an engineer’s design for anything large or risky.
  • Underground drainage. Tile drains and pipes are not in the ground model. Draw the culverts you know of; tile drains can still bring water from land outside the surface catchment.
  • Flat ground. On a flat drained farm a few centimetres decide where water goes, and the open drains do the work. The catchment boundary there can look arbitrary.
  • Changes since the survey. The ground is as the LiDAR recorded it. New tracks, drains and earthworks are not in it.
  • The rules. Culverts and fish passage are regulated by your regional council. Ask before you build.

Related guides

Frequently asked questions

How do I work out the catchment area above a culvert?

Find the point where the stream or drain reaches the crossing, then map all the land that drains to that point and add it up. On paper that means tracing the ridgelines around the stream on a topo map and counting squares. The Catchment tool does it from LINZ LiDAR: click the crossing and it reports the area in hectares.

What size culvert do I need?

That depends on the catchment area and the rainfall where you are, so this site does not give one. DairyNZ’s crossings technote and the Ministry for the Environment’s culvert guide for farmers have tables: find your rainfall band, then the catchment area closest to yours. For large catchments, or anything that would flood a house or a road if it failed, ask your regional council or an engineer.

Why not just count squares on a topo map?

You can, and the farm guides say how: one square on an NZMS 1:50,000 map is 100 ha. But most farm crossings drain far less than one square, and at that size the topo map’s 20 m contours cannot show where the ridgeline sits. LiDAR reads the ground about every metre, so small catchments come out to a tenth of a hectare.

There is already a culvert upstream. Does the tool know?

Not unless you tell it. Pipes are not in the ground model, so water arriving at a road embankment upstream is routed over it, or away from your crossing. Draw the existing culvert under Culverts & barriers and run again, and its water is counted.

It says "Not the whole catchment". What now?

The land draining to your crossing reaches past the 5 km the tool reads, so the area shown is a minimum. A catchment that big is a river crossing, and the farm culvert tables are not meant for it. Talk to your regional council or an engineer.

Does a new culvert need a consent?

It can. Culverts, fish passage and work in waterways are covered by regional plans and national regulations, and the rules differ between regions. Check with your regional council before you build.